That is Homer Brown on the roof. He knows steel roof construction. The ground was fairly level in front of the trailer. The ground fell down a slope behind the trailer. One leg had to be 19 feet long. The standard length was 12 feet. The front legs fit into one prefab steel piece in front. But behind the trailer the legs had to be taylor cut to fit the slope. Steel pipes were driven into the ground. Then the leg was lifted and lowered over the pipe. No cement was used.
Looking good. Almost ready for sheeting.